| TENDER NO. | DEPT | CATEGORY | NARRATION | OPENING DT | CLOSING DT | AMOUNT PUT TO TENDER | DOWNLOAD |
|
| PWD | PWD | At the time of immersion of the durga idol in the river hooghly the structure & other floating different materials are removed from the river hooghly and stored at a specific place & stored meterials should be lifted to the tractor on the very next day. | 2026-09-11 | 2026-09-17 | - |  |
|
| PWD | PWD | At the time of immersion of the durga idol in the river hooghly the structure & other floating different materials are removed from the river hooghly and stored at a specific place & stored meterials should be lifted to the tractor on the very next day. | 2026-09-11 | 2026-09-17 | - |  |
|
| PWD | PWD | Labour deploying at the all immerssion ghats for cleaning of the river hooghly, on the mentioned day. | 2026-09-11 | 2026-09-17 | - |  |
|
| PWD | PWD | Deploying 14 ton hydra including driver, fuel and necessary all complete. | 2026-09-11 | 2026-09-17 | - |  |
|
| PWD | PWD | Deploying 14 ton hydra including driver, fuel and necessary all complete. | 2026-09-11 | 2026-09-17 | - |  |
|
| PWD | PWD | Pw_xi_ten_2q-i_26-27_05 | 2026-07-28 | 2026-08-04 | - |  |
|
| COSERVANCY | CONSERVANCY | Corrigendum__niq no. pw_xi_ten_2q-i_26-27_06 dated 29.07.2026 in place of niq no. pw_xi_ten_2q-i_26-27_19 dated 29.07.2026. | 2026-07-30 | 2026-08-06 | - |  |
|
| PWD | PWD | Removal of rubbish with soil from filled up portion of "doba" of mr. indrajit seth at surerpukur bishaharitala byelane (l.r. dag - 222) in ward no.- 01 | 2026-08-01 | 2026-08-07 | - |  |
|
| PWD | PWD | Repairing work of shop at sukdeb sing road in ward no.-12 under cmc | 2026-09-01 | 2026-09-08 | - |  |
|
| PWD | PWD | Renovation of helapukur road starting from shib mandir to palpara road in ward no.-07 under cmc. | 2026-09-01 | 2026-09-08 | - |  |