| TENDER NO. | DEPT | CATEGORY | NARRATION | OPENING DT | CLOSING DT | AMOUNT PUT TO TENDER | DOWNLOAD |
|
| GEN. ADMINISTRATION DEPT. | MISCELLANEOUS | Ia_tend_2026-27_63 | 2026-07-13 | 2026-07-20 | - |  |
|
| GEN. ADMINISTRATION DEPT. | MISCELLANEOUS | Ia_tend_2026-27_64 | 2026-07-13 | 2026-07-20 | - |  |
|
| PWD | PWD | Surrounded nylon netting with bamboo structure which will be floating on the water at about 30m radius from the bank of hooghly river to protect flowing out of different articles of jagadhatri idols at the specific immersion ghats.
(rani ghat on river hooghly w-12) | 2026-09-25 | 2026-10-07 | - |  |
|
| PWD | PWD | Surrounded nylon netting with bamboo structure which will be floating on the water at about 30m radius from the bank of hooghly river to protect flowing out of different articles of jagadhatri idols at the specific immersion ghats.
(shibbati ghat on river hooghly w-06) | 2026-09-25 | 2026-10-07 | - |  |
|
| PWD | PWD | Surrounded nylon netting with bamboo structure which will be floating on the water at about 30m radius from the bank of hooghly river to protect flowing out of different articles of jagadhatri idols at the specific immersion ghats.
(bijendra ghat on river hooghly w-24) | 2026-09-25 | 2026-10-07 | - |  |
|
| PWD | PWD | At the time of immersion of the jagadhatri idol in the river hooghly the structure & other floating different material are removed from the river hooghly and stored at a specific place.
(ranighat on river hooghly w-12) | 2026-09-25 | 2026-10-07 | - |  |
|
| PWD | PWD | At the time of immersion of the jagadhatri idol in the river hooghly the structure & other floating different material are removed from the river hooghly and stored at a specific place.
(shibbati ghat on river hooghly w-12) | 2026-09-25 | 2026-10-07 | - |  |
|
| PWD | PWD | At the time of immersion of the jagadhatri idol in the river hooghly the structure & other floating different material are removed from the river hooghly and stored at a specific place.
(bijendra ghat on river hooghly w-12) | 2026-09-25 | 2026-10-07 | - |  |
|
| PWD | PWD | At the time of immersion of the jagadhatri idol in the river hooghly the structure & other floating different material are removed from the river hooghly and stored at a specific place.
(kachri ghat, w-24, & mill ghat w-26 on river hooghly as per required) | 2026-09-25 | 2026-10-07 | - |  |
|
| PWD | PWD | After the immersion of the jagadhatri idol, the stored material should be lift to the tractor on the mentioned day.
(labour placed as per required - rani ghat, shibbati ghat & bijendra ghat, as per required) | 2026-09-25 | 2026-10-07 | - |  |